Buffer sizing
- Average daily usage (ADU)
- The average quantity of an item used or sold per day over a rolling window. Past ADU uses history, forward ADU uses forecast or known demand, and blended ADU weights both. Days with no usage count as zero.
Past ADU = usage in the last N days ÷ NADU guide → - Decoupled lead time (DLT)
- The longest cumulative lead time from an item back to the nearest stocked buffer (or the supplier) along any unbuffered path. Usually shorter than the full end-to-end lead time.
- Decoupling point
- A position in the supply chain where stock is held as a buffer, so that variation on one side doesn't pass straight through to the other.
- Buffer profile
- A group of items that behave alike (for example purchased, short lead time, high variability) and share the same lead time and variability factors.
- Lead time factor
- A percentage that sizes the red base and the minimum green zone. Longer lead times get a smaller factor because the yellow zone is already large; common starting points are 70%, 50% and 30% for short, medium and long.
- Variability factor
- A percentage of the red base added as red safety. More erratic demand or supply gets a larger factor; common starting points are 25%, 50% and 80%.
- Red zone
- The safety layer at the bottom of the buffer, made of a red base plus red safety.
Red = ADU × DLT × lead time factor × (1 + variability factor) - Yellow zone
- Covers average demand over the decoupled lead time: the core of the buffer.
Yellow = ADU × DLT - Green zone
- Sets the typical order size and frequency. The largest of the minimum order quantity, the lead-time-factor amount and the order-cycle amount.
Green = max(MOQ, ADU × DLT × lead time factor, ADU × order cycle) - Top of red (TOR)
- The upper edge of the red zone.
TOR = red - Top of yellow (TOY)
- The reorder trigger: when net flow position is at or below this level, an order is placed.
TOY = red + yellow - Top of green (TOG)
- The top of the buffer. Orders bring net flow position back up to this level.
TOG = red + yellow + greenBuffer zones worked example → - Average on-hand target
- The stock level a well-sized buffer should average over time, useful for comparing with today's inventory.
Average on hand ≈ red + green ÷ 2 - Demand adjustment factor (DAF)
- A multiplier on ADU for a planned, temporary change such as a promotion, launch or phase-out, usually applied about one lead time ahead of the change.
Adjusted ADU = ADU × DAF
Daily planning
- Net flow position (NFP)
- The planning position of a buffered item, compared with its zones to decide whether to order.
Net flow = on hand + on order − qualified demandNet flow guide → - On order
- All open supply already placed for the item, such as purchase, production and transfer orders, regardless of due date.
- Qualified demand
- The demand subtracted in net flow: open demand that is past due or due today, plus qualified order spikes.
- Order spike threshold
- The daily demand quantity that makes a future day a spike. Often set as a share of the red zone, such as 50%.
- Order spike horizon
- How far ahead to look for spikes. Often one decoupled lead time.
- Planning priority
- Net flow position as a percentage of top of green. Lower means more urgent, so items are sorted lowest first instead of by due date.
Priority = net flow ÷ TOG - On-hand alert
- An execution signal comparing physical stock with the red zone, used to decide which open orders to expedite. Separate from the planning signal.
- Minimum order quantity (MOQ)
- The smallest quantity a supplier or process accepts per order. A larger order is allowed; it doesn't have to be a multiple.
- Order multiple
- A pack or lot size that orders must be a multiple of, such as cases of 12. Orders are rounded up to it.
- Order cycle
- The desired number of days between orders for an item, used as one of the green zone candidates.
Classic inventory measures
- Safety stock
- Extra stock held to cover demand above average and late deliveries during the replenishment lead time.
SS = z × √(L × σd² + d² × σL²) (combined method)Safety stock formulas compared → - Cycle service level
- The probability of not running out during a replenishment cycle. It sets the z-score in safety stock formulas and is not the same as fill rate.
- Reorder point
- The inventory position at which to place a new order under continuous review.
Reorder point = daily demand × lead time + safety stock - Economic order quantity (EOQ)
- The order size that minimizes the sum of annual ordering and holding cost under steady demand.
EOQ = √(2 × annual demand × order cost ÷ annual holding cost per unit) - ABC analysis
- Classifying items by their share of annual usage value: A items carry most of the value, C items the least.ABC XYZ guide →
- XYZ analysis
- Classifying items by demand stability using the coefficient of variation: X steady, Y variable, Z erratic.